I got about 5 not very good pictures of current school construction and decided on these two. Basically there are two very large classroom buildings and four smaller buildings. They all have roofs, floors and 3/4's of them are painted. Windows and doors are in all but the last large one below. Both Yari and Euriel are excited that the new school may be ready for them next Fall.
Showing posts with label next fall. Show all posts
Showing posts with label next fall. Show all posts
Friday, January 31, 2014
Subscribe to:
Posts (Atom)

