Stopped by to check out the new school construction and they are sinking pilings for the foundation. The holes are 6 meters deep with a large 'tube' of re-bar down the middle later to be filled with cement. The old play field was over a meter higher than the old school but they have added another meter of crushed rock on top of that to avoid any chance of flooding. Much more work to go but they haven't stopped for the last month. Hope the money hold out.
Saturday, April 13, 2013
New Secondaria construction
Labels:
cement,
construction,
money,
pilings,
re-bar,
school,
Secondaria
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment