Saturday, July 18, 2015

Hidalgo extension to be paved

New pavement with adoquin, sidewalks, water and sewer


We were out at the Prepa yesterday getting Uriel enrolled and I noticed some heavy equipment and lots of drainage pipe next to the Sports Complex. On the way back I stopped and asked a supervisor what was up. He said new water lines, sewer, pavement and sidewalks all the way out to the Prepa.  That is great for me driving him to school because that road is usually terrible. I seriously doubt it will be finished before summer vacation is over.

0 comments:

Related Posts with Thumbnails

Archivo del blog